Every requirement, tracedto the step that proved it.
The requirements traceability matrix builds itself while the run happens. Requirement to script to step to evidence to defect to report. No spreadsheet.
- This pageApproved requirement
- Test scripts
- Autonomous execution
- You take over
- Defects logged
- This pageSigned OQ / PQ report
The matrix is a by-product, not a document you write.
The requirements traceability matrix builds itself as the run executes.
- Forward and backward traceTrace from requirement to evidence, or back again.
- Coverage counted per requirementCoverage is counted, not estimated.
- Part of the reportThe matrix is section 4.0 of the OQ / PQ report.
| Requirement | Script | Steps | Result | Evidence |
|---|---|---|---|---|
| URS-014.1 | TS-014-01 | 18 | Pass | 9f3c…a71e |
| URS-014.2 | TS-014-02 | 14 | Pass | 4b0e…c2d9 |
| URS-014.3 | TS-014-04 | 21 | Pass | d71a…08f4 |
| URS-014.4 | TS-014-05 | 17 | Pass | e2c8…5b13 |
| URS-014.5 | TS-014-06 | 26 | Fail · DEF-031 | 1c5f…3e6a |
Pick a requirement. See the whole path.
Every requirement has a path from itself to the evidence and the report line that proved it.
- Gaps flagged earlyGaps are flagged before execution starts.
- Untested blocks the reportAn untested requirement blocks the report.
- Every link opens the recordEach node in the path opens its record.
When a requirement changes, you see what it touches.
A change to a requirement shows its impact before you re-run anything.
- Impact list per scriptEvery affected script is listed.
- Re-run only what changedOnly affected scripts are re-run.
- Revisions retainedPrevious matrix revisions are retained.
RTM as PDF, Excel, or CSV. Included in the OQ / PQ report, section 4.0.
Where the matrix starts, and where it lands.
Questions about traceability.
If your question is not here, ask us. We reply within one working day.
Can we import an existing RTM?
This is under review.
Does it trace to URS, FRS, and configuration specification?
Yes, any approved document you upload.
What counts as covered?
A requirement with at least one executed step with evidence, and no open defect that blocks acceptance.
Can an auditor filter by risk level?
Yes.
See a full run on one of your systems.
Bring one approved requirement. We show you the chain end to end, on a system you already use, in under an hour.